The Evansville Water and Sewer Utility will be starting a Refresh Evansville project to replace the water mains along Sonntag Avenue. The construction is set to take from November 2022 to March 2023. The Westside Improvement Association will be effected.
Residents along the construction corridor can expect to see heavy construction over long periods of time. They may experience water outages and interruptions or delays in daily routines.
Learn more at www.RefreshEvansville.com

The Evansville Water and Sewer Utility maintains 1,000 miles of water lines – 600 miles of which are cast iron pipes with an average age of more than 90 years. Most of those pipes are now at or past their life expectancy.


You must be logged in to post a comment.